![]() Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers. Special Construction, Special Activity Rooms, Athletic Rooms.įire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems. Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.Įquipment, Athletic Equipment, Exercise Equipment. Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.įinishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting. Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers. Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry. The content management team will continue to pursue additional details as they become available.Ĭoncrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. A CIP is a financial schedule for short- and long-range projects which is updated regularly. *Project information has been obtained through a public capital improvement plan (CIP). As of January 17, 2023, further details regarding design and construction have not been identified. This project is in included in the Town of Castle Rock FY 2023-2027 Capital Improvement Plan. Actual construction and ongoing operating costs will be determined as planning is finalized. In 2025, a downpayment is planned for the proposed Sports Development Center. The plan for the new center has not been fully developed or publicly processed however, the new facility may include aquatics, gymnasiums, and/or other facilities yet to be determined. A new recreation facility is included in the Parks and Recreation approved strategic plan and master plan as it aligns with Council strategic priority of maintaining excellent parks and recreation services. A new indoor recreation center is planned for a 2025 opening and is needed to meet the demand created by growth. The Parks and Recreation Capital Fund includes planning for both parks and indoor recreation facilities as a core level of service for the Town. ![]() Town Hall Expansion and Renovation ProjectĪddition, Demolition, Renovation, Infrastructure - 32,000 SF RFQ Contractor - Construction Manager/General Contractor (CM/GC) New Construction, Infrastructure - 115,000 SFĢ023 Curb, Gutter and Sidewalk Replacement Project Refunds will not be provided retroactively to registrations made prior to an account update to discount eligibility.Station 156 Construction - 78-18 - Town of Castle Rock Account updates may take up to one business day to process. If you qualify and your account is updated, resident discounts in any of our offerings, in which the resident discount is offered, will automatically be applied. If you just created an account or are registering a dependent you just added to your account, please send or bring in proof of residency as outlined on the State of Colorado Department of Revenue webpage to have your account reviewed to qualify for this discount. This program offers a resident discount rate to individuals and families verified to be paying taxes to the Town of Castle Rock. The MAC and the Recreation Center have separate passes and memberships Resident discount rate Please note, passes and memberships are only valid at the facility for which they are purchased. To request changes, cancellations or holds on your existing pass, please complete the MAC/REC pass change form.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |